The contractor and the engineer of record was | Retrieved on 5 May 2006 |
---|---|
, Retrieved 11 April 2009 | This has led Dubai clerics to rule that those living above the 80th floor should wait 2 additional minutes to break their fast, and those living above the 150th floor, 3 minutes |
However, over the next two and a half years, overseas investors steadily began to purchase the available apartments and office space.
7A are used to support the height of the building | 13 May 2007: Sets record for vertical on any building at 452 m 1,483 ft , surpassing the 449 |
---|---|
"Seismic fragility relationships of reinforced concrete high-rise buildings" | The opening was held on 4 January 2010 |
On 8 February 2010, the observation deck was closed to the public for two months after power-supply problems caused an elevator to become stuck between floors, trapping a group of tourists for 45 minutes.
5